Technical Information
a floor area (24-35)
- 24
Total gross floor area
- 37761 sq. metres
- divided into
- 25
Open access services
- 15703 sq. metres
- special rooms for (26-29)
- 26
Audiovisual
- 27
Computers
- 28
Special collections
- 29
Seminar room(s)
- special activities (30-32)
- 30
Exhibition space
- 31
Lecture hall
- 100 sq. metres
- 32
Public refreshments
- 100 sq. metres
- 33
Administration and staff areas
- 2568 sq. metres
- 34
Closed access stacks
- 35
Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc.
- 5700 sq. metres
- 36
Further information
- 37
Number of reader seats (total)
- 1500
- divided into
- 38
Audiovisual
- 39
Computers
- 70
- 40
Seminar room(s)
- 300
- 41
Regular
- 1200
b total potential capacity of shelving
- 42
Books and periodicals (total)
- 26445 linear metres
- including
- 43
Open access stacks
- 21973 linear metres
- 44
Closed access stacks
- 4472 linear metres
- 45
Compact shelving
- 14403 linear metres
- 46
Audiovisual materials
- 47
Other
- 48
Number of staff required to operate the new library
- 64
c mechanical features
- 49
Ventilation/Air Conditioning
- Im Hohlraumboden geführte Luft. Nur im Buchmagazin Klimaanlage. Geothermie erzeugt 70% des für Heizung und Kühlung benötigten Energiebedarfs des Campus.
- 50
Heating
- Wärmepumpe, lediglich für Spitzenlasten und Hochtemperatur-Verbraucher wird noch ein Fernwärmeanschluss benötigt. Betonkernaktivierung mit zusätzlichen Heizkörpern oder Bodenkonvektoren.
- 51
Lighting
- Leuchtstoffröhren in Rastergehäuse
- 52
Acoustics
- 53
Lifts, elevators, escalators
- 54
Book transportation system
- 55
Theft detection
- RFID auf UHF Frequenz
- 56
Building management system
- 57
Type of IT infrastructure
- 58
Other