Technical Information

a floor area (24-35)

24 Total gross floor area
28 175 m² (inc small new mezzanine addition)
divided into
25 Open access services
19 102 m²
special rooms for (26-29)
26 Audiovisual
53 m²
27 Computers
1 564 m²
28 Special collections
BS5454 archive storage facilities, conservation studio, digital imaging studio, viewing room, reading room, research centre and seminar rooms.
2 946 m2
29 Seminar room(s)
545 m²
special activities (30-32)
30 Exhibition space
118 m²
31 Lecture hall
n/a
32 Public refreshments
378 m² Library Cafe
33 Administration and staff areas
4 912 m²
34 Closed access stacks
2 365 m²
35 Circulations areas (corridors, stairs, lifts), toilets, technical rooms, etc.
3 706 m²
36 Further information
8 levels, 7 open to the public
37 Number of reader seats (total)
2 248
divided into
38 Audiovisual
AV equipment in all meeting rooms and study pods
39 Computers
573
40 Seminar room(s)
8 inc 3 training room
41 Regular
0

b total potential capacity of shelving

42 Books and periodicals (total)
31 464 linear metres plus 13 463 linear metres Special Collections
including
43 Open access stacks
31 465 linear metres
44 Closed access stacks
13 463 linear metres
45 Compact shelving
included in 43 above
46 Audiovisual materials
included in 44 above
47 Other
0
48 Number of staff required to operate the new library
185

c mechanical features

49 Ventilation/Air Conditioning
Chilled beam system
50 Heating
Chilled beam and space radiators fed by University Combined Heat and Power system
51 Lighting
Intelligent
52 Acoustics
Features, eg tiles, absorb sound
53 Lifts, elevators, escalators
3 lifts, to be upgraded at end of project
54 Book transportation system
No. 2 3M Book return sorters
55 Theft detection
Boon Edam
56 Building management system
BEMS centralled controlled by University Estates and Building
57 Type of IT infrastructure
All building wireless enabled. Wiring is Cat 6 in raised floor
58 Other
Original static shelving reused, braced and with new acrylic pastel coloured shelf ends 2 offsite stores created, one permanent, one for duration of project.